Quality Risks Performance through Monitoring and Control: The Role of Subcontractor Construction Management at the Gas Unitization Project

  • Agung Mahendro
  • Sutanto Hidayat
  • Maranatha Wijayaningtyas
Keywords: control, construction, monitoring, performance quality, risk management

Abstract

Due to rising levels of complexity and intense competition, effective risk management is a must for any project manager hoping to see their work through to completion. Since risks are evaluated according to their possible impact on project goals, there is a direct correlation between good risk management and successful projects. To minimise deviations from objectives, monitoring and control are carried out regularly. This research aims to directly analyse the influence of direct technical, financial, resource, managerial, and communication risks from subcontractors on the quality of building construction performance and through monitoring and control intervening. This study used a quantitative approach through questionnaires and documentation. The participants in this study were 39 individuals who were directly involved with PT—Rekayasa Industri subcontractors on the Jambaran Tiung Biru project. The subcontractors were responsible for completing a specific work package. According to the Partial Least Square analysis, technical and resource risks negatively and significantly impact building performance quality. Financial and managerial risks substantially and indirectly influence the quality of building construction performance through monitoring and control.

References

Adinyira, E., Agyekum, K., Danku, J. C., Addison, P., & Kukah, A. S. (2020). Influence of subcontractor risk management on quality performance of building construction projects in Ghana. Journal of Construction in Developing Countries, 25(2), 175-197.
Al-Hammad, A. M. (2000). Common interface problems among various construction parties. Journal of Performance of Constructed Facilities, 14(2), 71-74.
Ardhiansyah, W., Tjendani, H. T., & Witjaksana, B. (2023). Analysis of Contractor Performance on Stakeholder Satisfaction in Construction Expenditure Projects Rehabilitation of Malang City Using the PLS Method. Devotion Journal of Community Service, 4(1), 44-58.
Edwards, P. J., & Bowen, P. A. (1998). Risk and risk management in construction: a review and future directions for research. Engineering Construction and Architectural Management, 5(4), 339-349.
Fisk, E. R. & Reynolds, W. D. (2010). Construction Project Administration. New Jersey: Prentice Hall.
Iqbal, S., Choudhry, R. M., Holschemacher, K., Ali, A., & Tamošaitienė, J. (2015). Risk management in construction projects. Technological and Economic Development of Economy, 21(1), 65-78.
Isikyildiz, S., & Akcay, C. (2020). Multi-objective optimization of time-cost-quality in construction projects using genetic algorithm. Revista de la Construcción, 19(3), 335-346.
Issa, U. H. (2013). Implementation of lean construction techniques for minimizing the risks effect on project construction time. Alexandria Engineering Journal, 52(4), 697-704.
Jayasudha, K., & Vidivelli, B. (2016). Analysis of major risks in construction projects. ARPN Journal of Engineering and Applied Sciences, 11(11), 6943-6950.
Kendrick, T. (2015). Identifying and Managing Project Risk. American Management Association.
Keshk, A. M., Maarouf, I., & Annany, Y. (2018). Special studies in management of construction project risks, risk concept, plan building, risk quantitative and qualitative analysis, risk response strategies. Alexandria Engineering Journal, 57(4), 3179-3187.
Li, H., Arditi, D., & Wang, Z. (2015). Determinants of transaction costs in construction projects. Journal of Civil Engineering and Management, 21(5), 548-558.
Li, X., Xu, J., & Zhang, Q. (2017). Research on construction schedule management based on BIM technology. Procedia Engineering, 174, 657-667.
PMI. (2017). Project Management Body of Knowledge (PMBOK) (6th ed.). Pennsylvania: Project Management Institue.
Szymanski, P. (2017). Risk management in construction projects. Procedia Engineering, 208, 174-182.
Wijayaningtyas, M., & Munasih, M. (2024). The Application of Analytical Hierarchy Process (AHP) to Determine The Construction Project Risk. In E3S Web of Conferences (Vol. 476, p. 01060). EDP Sciences.
Zavadskas, E. K., Turskis, Z., & Tamošaitiene, J. (2008). Contractor selection of construction in a competitive environment. Journal of Business Economics and Management, 9(3), 181-187.
Published
2024-02-06
How to Cite
Mahendro, A., Hidayat, S., & Wijayaningtyas, M. (2024). Quality Risks Performance through Monitoring and Control: The Role of Subcontractor Construction Management at the Gas Unitization Project . European Journal of Science, Innovation and Technology, 4(1), 99-107. Retrieved from https://ejsit-journal.com/index.php/ejsit/article/view/366
Section
Articles